Slayter Creek Wastewater Treatment Plant Influent Lift Station

Project Description: Installation of a new lift station wet well, pumps, and appurtenances to replace the existing screw pumps that deliver influent flow to the wastewater plant. The existing pumps have reached the end of their useful life and can no longer be rehabilitated efficiently. One pump is inoperable and the failure of the remaining pump is imminent. This project will provide for a modern and reliable influent lift station that is easily serviceable and is designed to have redundant pumping systems.

Project Status: Completed 5-26-15

Contractor(s): RAMA Enterprises, LLC, Dallas, Texas (General) Alpha Testing, Dallas, Texas (Materials testing)

Project Cost: $623,892.24 

Funding Source: The project is fully funded by the 2012 Certificates of Obligation designated for  improvements to the wastewater treatment plant. 

__________________________________________________________________

Hackberry Water Line

Hackberry Waterline  
Project Description: 10,500 linear feet of 12" and 6" water line along future Hackberry Lane and future Ferguson Parkway. The line will provide a critical water loop within the water system and service the Hackberry Elevated Storage Tank.  

Project Status: Complete.

Contractor: Landmark Structures Inc. Ft. Worth, Texas

Project Engineer: Birkhoff, Hendricks & Carter, LLP

 
Project Cost: $737,284.50 

Funding Source: The project is fully funded by the 2014 Certificates of Obligations designated for water system improvements.
_____________________________________________________

2014 Texas Community Development Block Grant Project
  - Sanitary Sewer TxCDBG SewerReplacement

Project Description: Installation of new 6” sanitary sewer, manholes, and services to replace existing sewer infrastructure along S. Interurban, S. Riggins, Cunningham, Genoveva and Edward Streets. This project replaces old and poorly designed sewer infrastructure that is causing increased flow during and surrounding a rain event. This project will reduce treatment costs at our wastewater plant by reducing inflow and infiltration during rain events. Grant Consultant Lawrence and Associates.

Contractor: A & M Construction and Utilities, Inc. Rowlett, Texas

Design Engineer: Birkhoff, Hendricks & Carter, LLP

Project Status: Complete.

Project Cost: $288,841.15

Funding Source: The project is fully funded by the Texas Community Development Block Grant Program and matching funds from the City of Anna.
_____________________________________________________

Slayter Creek Wastewater Treatment Plant Evaluation


Project Description: Evaluation of the Slayter Creek Wastewater Treatment Plant to determine if the plant has additional capacity and could be permitted for additional flow. The evaluation also examines the current infrastructure at the plant to determine what, if any, improvements should be made to increase plant efficiency.   

Design Engineer(s): Birkhoff, Hendricks & Carter, L.L.P. (General) --- Kasberg, Patrick, and Associates, L.L.P.

Project Status: Complete.

Funding Source: The evaluation was funded by the 2012 Certificates of Obligation designated for wastewater system improvements.
__________________________________________________________________

Public Works/Planning & Development Parking Lot and Drive Way

Project Description: Reconstruction of a gravel drive and parking area to concrete. This project provides a new surface for visitors to the Public Works and Planning & Development professional offices. Due to the high volume of visits, a permanent surface was needed to accommodate the increased traffic and to provide ADA access to the building.  

Design Engineer: Birkhoff, Hendricks & Carter, L.L.P.
Contractor PWR Concrete, McKinney, Texas (paving) --- Alpha Testing, Dallas, Texas (materials testing)

Project Status: Completed

Project Cost: $68,526

Funding Source: Project was fully funded by General Fund assigned fund balance in the amount of $59,975 and a transfer to the project of $8,281 available in the 2015 Fiscal Year Budget contingency appropriation.

 

 



City of Anna • 111 N. Powell Parkway, P.O. Box 776 • Anna, TX 75409-0776 • Ph. (972) 924-3325 • Fax. (972) 924-2620
Home Home  |  Email Page Email Page  | Print Page Print  |  Calendar  |  FAQs  |  Contact Us  |  Accessibility  |  Site Map |  

Website Policy  |  Renewable Energy Windpowered | Powered by CivicPlus  | Copyright Notices