Projects Under Design


Foster Crossing Water Line

Project Description: Installation of 6,750 linear feet of twelve-inch water line generally along the north side of Foster Crossing between an existing 18” line along the DART rail and the Pecan Grove Subdivision. The Foster Crossing Water Line is necessary in order to provide a critical water line loop to the Pecan Grove and Anna Crossing subdivisions, serve future development and enable the City to fully utilize the Collin Pump Station located near the Collin County Outer Loop.

Design Engineer: Birkhoff, Hendricks & Carter, L.L.P.

Project Status: Easement acquisition. Opinion of Probable Project Cost $890,000

Funding Source: The project is fully funded by the 2012 Certificates of Obligation designated for water system improvements.
__________________________________________________________________

US 75 Utility Relocates

Project Description: Relocation of water and sewer lines in conflict with improvements to US 75 as proposed by the Texas Department of Transportation.   

Design Engineer: Birkhoff, Hendricks & Carter, L.L.P.

Project Status: Under design and in easement acquisition. Opinion of Probable Project Cost $1,800,000.

Funding Source: To be determined. A portion of the project qualifies as reimbursable by the Texas Department of Transportation.




 

 



City of Anna • 111 N. Powell Parkway, P.O. Box 776 • Anna, TX 75409-0776 • Ph. (972) 924-3325 • Fax. (972) 924-2620
Home Home  |  Email Page Email Page  | Print Page Print  |  Calendar  |  FAQs  |  Contact Us  |  Accessibility  |  Site Map |  

Website Policy  |  Renewable Energy Windpowered | Powered by CivicPlus  | Copyright Notices