Projects Under Design

East-West Collector Road

Project Description: Construction of a 37' wide concrete curb and gutter roadway near the northwest corner of US 75 and FM 455. The project will extend from the US 75 southbound frontage road through a large future commercial center with the project terminating at a large future residential development. 

Design Engineer: Birkhoff, Hendricks and Carter, L.L.P.

Project Status: Project is at 90% design and ready for solicitation of competitive sealed proposals. Opinion of Probable Construction Cost $529,136.

Funding Source: Project is fully funded by collected Roadway Impact Fees.

______________________________________________________________________

East-West Collector Water Line

Project Description: Construction of a 12" water line along the East-West Collector Road located near the northwest corner of US 75 and FM 455. The project will extend from the US 75 southbound frontage road through a large future commercial center with the project terminating at a large future residential development. 

Design Engineer: Birkhoff, Hendricks and Carter, L.L.P.

Project Status: Project is fully designed. Soliciting competitive sealed proposals. Opinion of Probable Construction Cost $369,618.

Funding Source: Project is fully funded by collected Roadway Impact Fees.